Case Studies

Detailed breakdowns of representative projects — timelines, crew allocation, deliverables, and technical notes so you can assess fit and lead times.

Broadcast Spot — National Campaign

Deliverables: 30/15/6s versions • IMF • ProRes HQ  |  Tools: Resolve, ProTools • Timeline: 48 hours from edit lock
Broadcast Campaign

We partnered with a national broadcaster to produce a high-energy :30 spot and platform-size variants. Tight turnaround required parallel grading and delivery workflows.

Crew: 1 Colorist • 1 Editor • 1 Sound
Turnaround: 48h
Revisions: 2
Hour 0–6

Ingest & proxy • QC

Hour 6–24

Parallel grade & sound

Hour 24–48

Deliverable encoding & QC

Product Launch — E‑commerce Visuals

Deliverables: 4K hero renders • 360 turntable • AR glTF • Pipeline: Maya, Substance, Arnold
Product Launch

Full-service CG pipeline for retail launch: high-fidelity hero renders, fast-turn social cuts, and AR-ready exports for web previews.

Crew: 2 CG Artists • 1 TD • 1 Compositor
Delivery: 10 working days
Aspects: 16:9 • 1:1 • 9:16
Day 1–3

Model & texture

Day 4–7

Lighting & renders

Day 8–10

Comp & delivery

Streaming Series — Episodic Conform & Grade

Deliverables: IMF masters • Color LUTs • Episode dailies • Timeline: 8 eps in 6 weeks
Streaming Series

We delivered episodic color and conform services for a streaming platform with strict ACES/LUT requirements and IMF packaging.

Crew: 2 Colorists • 1 Conform Editor • 1 Producer
Throughput: 1 episode/week
First-pass QC: 96%
Week 1

Pilot conform & grade

Week 2–6

Batch process & master

Delivery

IMF + mezzanine

Brand Campaign — VFX & Motion

Deliverables: Multi-aspect cuts • Social trailers • Motion templates • Tools: AE, Nuke
Brand Campaign

Integrated motion and VFX campaign for a product reveal. Required retiming, object removal and motion-graphics templates for in-house reuse.

Crew: 3 Motion Artists • 1 VFX Lead
Turnaround: 3 weeks
Deliverables: 12 assets
Week 1

Concept & edit

Week 2

VFX & motion

Week 3

Delivery & templates

Documentary Short — Archival Restoration

Deliverables: Restored masters • Audio sync • Subtitles • Tools: Resolve, Izotope RX
Documentary

Archival footage restoration and audio cleanup for a short documentary. We stabilized, denoised and color-matched historical plates into a modern master.

Crew: 1 VFX • 1 Color • 1 Sound
Turnaround: 2 weeks
Deliverables: ProRes • Subtitles
Phase 1

Assess & restore

Phase 2

Match & grade

Phase 3

Deliver

AR Experience — Retail Pop‑up

Deliverables: AR glTF • Web viewer • 3D optimization • Tools: Blender, Substance, WebGL
AR Retail

Lightweight AR models and a web viewer for an in-store pop-up. Focus on mobile performance and accurate PBR materials.

Crew: 1 3D Artist • 1 Dev
Delivery: 12 days
Optimized < 5MB
Day 1–4

Model & bake

Day 5–8

Optimize & test

Day 9–12

Deploy

Studio Capabilities & Performance

Across projects we maintain reproducible workflows, consistent QC, and predictable SLAs.

Global teams • 24/7 coverage
Secure S3 transfers
Versioned masters
IMF & DCP support
DaVinci Resolve
Nuke
After Effects
Pro Tools
Frame.io
ShotGrid
Blender
96%
Average first-pass acceptance
2.1
Avg revision rounds
1–3d
Typical fast-turn delivery

"Graphix Lab consistently delivers on tight deadlines. Their engineering-first approach saved our launch schedule."

— Aaron T., Creative Director

"The templates and motion kits they supplied reduced our in-house turnaround by weeks."

— Mei L., Head of Content

Request a Case Pack

Tell us which projects you want more detail on and we’ll prepare a case pack with timelines, crew CVs, and technical specs.

We usually respond within 1–2 business days (UTC).